Fast track sites, GRD-RDS

The MADAF Fast Track site can be deployed and constructed within 24hrs.

GRD on Rent at desert location      
       
Sharing Multi Operator      

40 Meters self support sharable GRD for Multi Operators.

10 X 10 Meter Foot Print.

Precast foundation above the ground level.

Complete installation with in 48 hours unique design tower shape and loading.

 
       
Single Operator      

a. Fast track solution.

B. Precast foundation above ground service.

C. Quick deployment.

D. Installation time within 48 hours.

E. Smaller foot print less than 10mx10m.